+86-17806251018         qdxgz08@qdxgz.cn
PRODUCTS
You are here: Home » Products » Industrial Building » Steel Structure » Prefabricated Steel Structure Frames Platform Suppiler Manufacturer

loading

Share to:
facebook sharing button
twitter sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Prefabricated Steel Structure Frames Platform Suppiler Manufacturer

Steel Structure Frames Platform is usually composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plates; the components or components are connected by welding, bolts or rivets. Some steel structures are also made of steel hinge wire, steel wire rope or steel wire bundle, cast steel and other materials.

Availability:
Quantity:

1. Product feature and application for Prefabricated Steel Structure Frames Platform suppiler manufacturer

a. Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS.
c. Cost considering: Time saved, cost saved.
d. Easy installation, materials can be recycled used, environmentally.
c. Used widely: Hotel, apartment.
d. Structural durability, easy maintenance.

steel platformsteel structure platform

2. Materials for Prefabricated Steel Structure Frames Platform suppiler manufacturer

Main Steel Structure Welded/ hot-rolled H sections
Surface treatment Painting or hot-dipped galvanized
Stairs and rail Steel stairs and power coated rail
Floor Steel floor deck then concrete layer
Facility Toilet, shower room, washbasin cabinet and etc

3. Advantages of Prefabricated Steel Structure Frames Platform suppiler manufacturer

  • Quick and flexible assembly.

All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.

  • Cost- effective.

It will significantly shorten the construction period of your buildings, saving a great deal of time and money.

  • High safety and durability.

The steel structure has light weight but high strength, which is also easy to maintain. It can be utilized for over 50 years.

  • Optimal design.

The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.

  • High utilization.

It is easy to move and relocate steel structure, which can also be recycled without pollution.

  • Solid construction.

The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has excellent seismic performance.


4. Production line for Prefabricated Steel Structure Frames Platform suppiler manufacturersteel structure manufacturer

5. Packing and delivery for Prefabricated Steel Structure Frames Platform suppiler manufacturer

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

prefabricated platform

6. Our customer

We keep in good connection with the oversea merchants, and have exported our products to over 120 countries, such as Canada, Australia, Germany, Brazil, England, the USA, Singapore, Thailand, Uruguay, Venezuela and Japan. Our Services and Product Quality are praised by most of our clients.  

prefabricated steel structure

7. FAQ

Q: Are you a factory or trading company?

 A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop   service for our customer. And you can get the best price and competitive price.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: what is the terms of payment?

A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)

Q: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Q: How long can the space frame be used?

A: The use life of the main structure is the designed used life, that is 50-100 years (standard request of GB).


8.Basic design requirements of Prefabricated Steel Structure Frames Platform suppiler manufacturer

Basic Design Requirements

1.Project location

5.Length (side wall,m)

9.Window quantity, size(if needed)

2.Snow load

6.Width (end wall, m)

10.Door quantity, size(if needed)

3.Wind load

7.Wall Height (eave, m)

11.Brickwall needed or not. If yes, 1.2m high or 1.5m high

4.Seismic magnitude

8.Middle column allowed or not

12.Crane needed or not(if needed)
13.Other requirements
Previous: 
Next: 

SINCE 1997

About Us
One of the leading steel structure companies in North China is Qingdao Xinguangzheng Steel Structure Co., Ltd.

Links

Contact Us
CONTACT US
TAG:
Steel Sheds
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap