+86-17806251018         qdxgz08@qdxgz.cn
PRODUCTS
You are here: Home » Products » Industrial Building » Steel Workshop » High Rise Steel Framing For Commercial Concrete Factory Workshop

loading

Share to:
facebook sharing button
twitter sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

High Rise Steel Framing For Commercial Concrete Factory Workshop

Availability:
Quantity:
1. Materials for High Rise Steel Framing For Commercial Concrete Factory Workshop 


Main Steel Structure H section, Galvanized C purlin
Roof UPVC roof with glass wool insulation
Wall Cement sandwich panel with real stone painting
Window Aluminum power coated window
Door Wooden or steel entrance door
Stairs and rail Steel stairs and power coated rail
Gutter Galvanized or color aluminum
Facility Toilet, shower room, washbasin cabinet and etc
2. High Rise Steel Framing For Commercial Concrete Factory Workshop Pictures DJI_0070 主图 IMG_9723 DJI_0083


sdhka_3sdhka_1

  • Quick and flexible assembly.

All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.

  • Cost- effective.

It will significantly shorten the construction period of your buildings, saving a great deal of time and money.

  • High safety and durability.

The steel structure has light weight but high strength, which is also easy to maintain. It can be utilized for over 50 years.

  • Optimal design.

The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.

  • High utilization.

It is easy to move and relocate steel structure, which can also be recycled without pollution.

  • Solid construction.

The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has excellent seismic performance.

3. Production line for High Rise Steel Framing For Commercial Concrete Factory Workshop

生产线图片

4. Packing and delivery for High Rise Steel Framing For Commercial Concrete Factory Workshop

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

发货图片

5. Packing and delivery for High Rise Steel Framing For Commercial Concrete Factory Workshop

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

客户照片

6. FAQ

 Q: Are you a factory or trading company?

 A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop   service for our customer. And you can get the best price and competitive price.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: what is the terms of payment?

A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)

Q: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Q: How long can the space frame be used?

A: The use life of the main structure is the designed used life, more than 50 years (standard request of GB).


7. Basic design requirements of High Rise Steel Framing For Commercial Concrete Factory Workshop

Basic Design Requirements

1.Project location 5.Length (side wall,m) 9.Window quantity, size
2.Snow load 6.Width (end wall, m) 10.Door quantity, size
3.Wind load 7.Wall Height (eave, m) 11.Brick wall needed or not. If yes, 1.2m high or 1.5m high
4.Seismic magnitude 8.Middle column allowed or not 12.Crane needed or not
13.Thermal insulation. If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
Previous: 
Next: 

SINCE 1997

About Us
One of the leading steel structure companies in North China is Qingdao Xinguangzheng Steel Structure Co., Ltd.

Links

Contact Us
CONTACT US
TAG:
Steel Sheds
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap