+86-17806251018         qdxgz08@qdxgz.cn
PRODUCTS
You are here: Home » Products » Industrial Building » Steel Workshop » Economical Factory Peb Prefabricated Steel Structure Workshop Building

loading

Share to:
facebook sharing button
twitter sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Economical Factory Peb Prefabricated Steel Structure Workshop Building

Product feature and application for Economical Factory Peb Prefabricated Steel Structure Workshop Building 

Availability:
Quantity:
产品详情图 (3)
产品详情图 (1)
Main Steel Structure Welded&hot-rolled H section, Galvanized C&Z purlin
Roof EPS,glass wool ,fiberglass,PU insulation or steel sheet.
Wall EPS,glass wool ,fiberglass,PU insulation or steel sheet.
Window Aluminum power coated & Plastic steel window
Door Wooden or steel entrance door
Stairs and rail Steel stairs and power coated rail
Gutter Galvanized or color aluminum
  • Quick and flexible assembly.

All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.

  • Cost- effective.

It will significantly shorten the construction period of your buildings, saving a great deal of time and money.

  • High safety and durability.

The steel structure has light weight but high strength, which is also easy to maintain. It can be utilized for over 50 years.

  • Optimal design.

The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.

  • High utilization.

It is easy to move and relocate steel structure, which can also be recycled without pollution.

  • Solid construction.

The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has excellent seismic performance.

Production line for Economical Factory Peb Prefabricated Steel Structure Workshop Building

生产线图片

Packing and delivery for Economical Factory Peb Prefabricated Steel Structure Workshop Building

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

发货照片

Packing and delivery for Economical Factory Peb Prefabricated Steel Structure Workshop Building

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

客户照片

FAQ

 Q: Are you a factory or trading company?

 A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop   service for our customer. And you can get the best price and competitive price.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: what is the terms of payment?

A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)

Q: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Q: How long can the space frame be used?

A: The use life of the main structure is the designed used life, more than 50 years (standard request of GB).

Basic design requirements of Economical Factory Peb Prefabricated Steel Structure Workshop Building 

Basic Design Requirements

1.Project location 5.Length (side wall,m) 9.Window quantity, size
2.Snow load 6.Width (end wall, m) 10.Door quantity, size
3.Wind load 7.Wall Height (eave, m) 11.Brick wall needed or not. If yes, 1.2m high or 1.5m high
4.Seismic magnitude 8.Middle column allowed or not 12.Crane needed or not
13.Thermal insulation. If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
Previous: 
Next: 

SINCE 1997

About Us
One of the leading steel structure companies in North China is Qingdao Xinguangzheng Steel Structure Co., Ltd.

Links

Contact Us
CONTACT US
TAG:
Steel Sheds
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap