+86-17806251018         qdxgz08@qdxgz.cn
PRODUCTS
You are here: Home » Products » Agricultural steel building » Metal Steel Frame Factory Structure Building Slaughter Workshop House

loading

Share to:
facebook sharing button
twitter sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Metal Steel Frame Factory Structure Building Slaughter Workshop House

The structure mainly made of steel is one of the main types of building structure. Steel is characterized by high strength, light weight, good overall rigidity, strong deformation ability, so it is especially suitable for the construction of large span and super high, super heavy buildings; The material has good homogeneity and isotropy and is an ideal elastomer, which most conforms to the basic assumptions of general engineering mechanics. The material has good plasticity and toughness, can have large deformation, and can bear the dynamic load well. Short construction period; With a high degree of industrialization, specialized production with a high degree of mechanization can be carried out.

Availability:
Quantity:

1. Product feature and application for Metal Steel Frame Factory Structure Building Slaughter Workshop

a.Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS
c. Cost considering: Time saved, cost saved;
d. Easy installation, materials can be recycled used, environmentally;
c. Used widely: Hotel, apartment
d. Structural durability, easy maintenance.

Slaughter Workshop Slaughter Workshop

Slaughter building Slaughter factory

 2. Main Specification of Metal Steel Frame Factory Structure Building Slaughter Workshop

Main Steel Structure Welded&hot-rolled H section, Galvanized C&Z purlin
Roof EPS,glass wool ,fiberglass,PU insulation or steel sheet.
Wall EPS,glass wool ,fiberglass,PU insulation or steel sheet.
Window Aluminum power coated & Plastic steel window
Door Wooden or steel entrance door
Stairs and rail Steel stairs and power coated rail
Gutter Galvanized or color aluminum

 

3. Advantages of Metal Steel Frame Factory Structure Building Slaughter Workshop

a. Quick and flexible assembly.

All the components will be prefabricated in the factory before transported to the construction site. The installation process is quick and easy.

b. Cost- effective.

It will significantly shorten the construction period of your buildings, saving a great deal of time and money.

c. High safety and durability.

The steel structure has light weight but high strength, which is also easy to maintain. It can be utilized for over 50 years.

d. Optimal design.

The prefab steel workshop can be isolated against outdoor environments as well as avoid any leak like water seepage. It also has excellent fire resistance and corrosion resistance.

e. High utilization.

It is easy to move and relocate steel structure, which can also be recycled without pollution.

f. Solid construction.

The steel structure fabrication workshop is capable of withstanding the attack of strong winds and heavy snow. It also has excellent seismic performance.

 

4. Production line for Metal Steel Frame Factory Structure Building Slaughter Workshop

steel fabrication

 

5. Packing and delivery for Metal Steel Frame Factory Structure Building Slaughter Workshop

Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.

china xinguangzheng

 

6. Our customer

We keep in good connection with the oversea merchants, and have exported our products to over 120 countries, such as Canada, Australia, Germany, Brazil, England, the USA, Singapore, Thailand, Uruguay, Venezuela and Japan. Our Services and Product Quality are praised by most of our clients.  

xinguangzheng group

7. FAQ

Q: Are you a factory or trading company?

 A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop   service for our customer. And you can get the best price and competitive price.

Q: Do you accept container loading inspection?

A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.

Q: Do you offer designing service for us?

A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.

Q: what is the terms of payment?

A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)

Q: What is the delivery time?

A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.

Q: How long can the space frame be used?

A: The use life of the main structure is the designed used life, more than 50 years (standard request of GB). 

 

8. Basic design requirements of Metal Steel Frame Factory Structure Building Slaughter Workshop

Basic Design Requirements

1.Project location 5.Length (side wall,m) 9.Window quantity, size
2.Snow load 6.Width (end wall, m) 10.Door quantity, size
3.Wind load 7.Wall Height (eave, m) 11.Brick wall needed or not. If yes, 1.2m high or 1.5m high
4.Seismic magnitude 8.Middle column allowed or not 12.Crane needed or not
13.Thermal insulation. If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.
Previous: 
Next: 

SINCE 1997

About Us
One of the leading steel structure companies in North China is Qingdao Xinguangzheng Steel Structure Co., Ltd.

Links

Contact Us
CONTACT US
TAG:
Steel Sheds
Copyright © 2021 Qingdao Xinguangzheng Steel Structure Co., Ltd. All Rights Reserved.                   Support Leadong    |    Sitemap