Column and beam | material Q345B & Q235BH section steel ( painted or galvanized) or square tube |
Wall&roof purlin | c or z section steel, size from c120~C320, z100~Z200 |
Wall&roof panel | colorful corrugated steel sheet(or with insulation material) / eps, rock wool, fiber glass, pu Sandwich panels. |
Supporting | steel angle, steel pipe, steel round. |
Gutter | steel sheet or galvanized steel sheet |
Rain spout | pvc pipe |
Door | sliding door |
Accessory | anchor bolt,high strengthen bolt, normal bolt, skylight panel, ventilators, etc. |
2. Main System of Hot Galvanized Steel Structure Fabrication Poultry Farm Broiler Chicken Farming
3.Products Description:
Prefabricated steel poultry shed comprised of primary structures,secondary structure,cladding systems, and automatic equipment control systems including:
1.Automatic feeding system
2.Automatic drinking system
3.Poultry house environmental control system
4.Automatic heating system
5.Automatic pick up eggs system
4. Advantages of Hot Galvanized Steel Structure Fabrication Poultry Farm Broiler Chicken Farming:
1. Environmental friendly
2. Lower cost and maintenance
3. Long using time up to 50 years
4. Stable and earthquake resistance up to 9 grade
5. Fast construction, time saving and labor saving
6. Automatic,intelligent
5. Products Show:
5.Materials of Hot Galvanized Steel Structure Fabrication Poultry Farm Broiler Chicken Farming:
6.Our service:
1. 24 hours online & one to one service, solve your problem efficiently.
2. Professional installation team and site engineers for foreign countries.
3. More than 25 years' experiences, our products had been exported to more than 80 countries all over the world.
4. We supply R & D, engineering, fabrication, exporting, and installation with one stop shopping service.
5. With ISO9001:2015, SGS, BV and CE certification
6. Xinguangzheng group with 5 branch factories located in Qingdao, Shandong Province. Our annual production capacity: only for H welded steel: 720,000 TONS – 1,200,000 TONS per year
Shipped in 30 days after drawing confirmed, packed with steel pallets and loading into shipping container.
9.FAQ:
1. Are your manufacturer or trading company?
We are manufacturer, we are group company with 5 factories & over 25 years experiences.
2. How to buy your ideal products?
A: T/T and L/C are acceptable and T/T will be more appreciated. 30% deposit before producing, 70% balance before loading by T/T.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 40 working days.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to install after the goods arriving destination?
A: We will provide detailed shop drawings to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.