Publish Time: 2022-07-01 Origin: Site
Industrial steel building is easy to move and recycle without pollution. These are stronger than traditional workshops, and the walls of the steel structure workshops can also be filled with bricks, which are completely load-bearing. All future plant constructions will be steel structure plants. Here we are going to introduce the steps of installing Industrial steel building.
What are the raw materials used in industrial steel building?
What is the main installation process of industrial steel building?
What is the production and installation process of industrial steel building?
In addition to iron and carbon, the raw materials of industrial steel building also contain other elements. Divided into permanent elements; occasional elements; hidden elements and alloying elements. The common elements are manganese, silicon, sulfur, and phosphorus. Incidental elements are due to the different origins of ore (there are intergrowth ore mixed with iron) and scrap steel as raw materials, such as copper, titanium, vanadium, rare earth elements, etc., are brought into steel during smelting and process operations. The cryptic elements refer to non-metal elements with a small atomic radius, such as oxygen and hydrogen. Alloying elements refer to elements specially added to change the composition, such as chromium, nickel, tungsten, molybdenum, vanadium, etc.
Carbon steel (referred to as carbon steel) is an iron-carbon alloy with a carbon content of more than 0.0218% and less than 2.11%. Because carbon steel has good mechanical properties and process properties, and is large in output and low in price, it is a metal material that is widely used in mechanical engineering. However, carbon steel also has some shortcomings, such as low hardening energy, poor temper softening resistance, and low yield ratio. The strength potential of carbon steel cannot be fully utilized even after heat treatment. In order to meet the continuous development of modern industry and science and technology, alloy steel was developed.
Foundation → production and installation foundation is divided into (foundation ground survey → foundation excavation → embedded screws → foundation casting → later foundation grouting → outdoor water dispersion → outdoor drainage ditch (some factory design indoor drainage ditch or cable ditch suggestion Completed simultaneously with installation)→Enclosure masonry→tiling tiles, etc.)
The production and installation are divided into (processing production→component painting→structural pre-assembly→steel component hoisting→main structure adjustment→purlin installation→door and window column installation→gutter downpipe installation→steel component painting (some are fireproof, some are Anti-corrosion, according to design requirements) → roof panel (some with steel mesh, some with insulation layer, completed at the same time) → wall panel installation → door and window installation → water supply and drainage installation → electrical equipment installation)