Availability: | |
---|---|
Quantity: | |
1. Production introduction of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
The steel exhibition hall has the advantages of perfect function, prominent image, unique shape and short construction period. It is widely used in shopping malls, hotels, supermarkets and other commercial sales spaces.
2. Specification of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
Steel framework (Q235B,Q355B) | 1.steel beam |
Wall and roof | 1.single steel sheet 0.36mm-0.6mm thick |
Door | 1.roller door |
Window | 1.sliding window |
Gutter | 1.aluminum-zinc steel sheet |
Downpipe | 1.pvc |
Skylight panel | FRP,1.5mm,2.0mm,2.5mm,according to your requirements |
Fire resistance rating | Grade 2 or as customer’s request. |
3. Product feature and application for Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
a.Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS
c. Cost considering: Time saved, cost saved;
d. Easy installation, materials can be recycled used, environmentally;
c. Used widely: Workshop,warehouse,etc
d. Structural durability, easy maintenance.
4. Product Picture of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
5. Product main material of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
6. Product production line of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
7. Delivery, shipping and service for Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
Shipped in 30 days after drawing confirmed, packed with steel pallets and loading into shipping container.
7. FAQ for design and quotation
Our excellent design team will design the Steel Prefab House for you. If you give the following information
a. Location (where will be built? ) _____country, area
b. Size: Length*width*height _____mm*_____mm*_____mm
c. wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
d. snow load (max. Snow height)_____kn/m2, _____mm
e. anti-earthquake _____level
f. brick wall needed or not If yes, 1.2m high or 1.5m high
g. thermal insulation If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be OK. The cost of the latter will be much lower than that of the former.
h. door quantity & size _____units, _____(width)mm*_____(height)mm
i. window quantity & size _____units, _____(width)mm*_____(height)mm
j crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m
1. Production introduction of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
The steel exhibition hall has the advantages of perfect function, prominent image, unique shape and short construction period. It is widely used in shopping malls, hotels, supermarkets and other commercial sales spaces.
2. Specification of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
Steel framework (Q235B,Q355B) | 1.steel beam |
Wall and roof | 1.single steel sheet 0.36mm-0.6mm thick |
Door | 1.roller door |
Window | 1.sliding window |
Gutter | 1.aluminum-zinc steel sheet |
Downpipe | 1.pvc |
Skylight panel | FRP,1.5mm,2.0mm,2.5mm,according to your requirements |
Fire resistance rating | Grade 2 or as customer’s request. |
3. Product feature and application for Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
a.Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS
c. Cost considering: Time saved, cost saved;
d. Easy installation, materials can be recycled used, environmentally;
c. Used widely: Workshop,warehouse,etc
d. Structural durability, easy maintenance.
4. Product Picture of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
5. Product main material of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
6. Product production line of Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
7. Delivery, shipping and service for Pre Engineered Metal Frame Construction Materials Water Plant Building Contractor
Shipped in 30 days after drawing confirmed, packed with steel pallets and loading into shipping container.
7. FAQ for design and quotation
Our excellent design team will design the Steel Prefab House for you. If you give the following information
a. Location (where will be built? ) _____country, area
b. Size: Length*width*height _____mm*_____mm*_____mm
c. wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s
d. snow load (max. Snow height)_____kn/m2, _____mm
e. anti-earthquake _____level
f. brick wall needed or not If yes, 1.2m high or 1.5m high
g. thermal insulation If yes, EPS, fiberglass wool, rock wool, PU sandwich panels will be suggested; If not, the metal steel sheets will be OK. The cost of the latter will be much lower than that of the former.
h. door quantity & size _____units, _____(width)mm*_____(height)mm
i. window quantity & size _____units, _____(width)mm*_____(height)mm
j crane needed or not If yes, _____units, max. Lifting weight____tons; Max. Lifting height _____m