Steel fabrication is the process of bending, cutting, and modelling steel to form a structure. Structural steel fabrication is when pieces of steel are put together to make different structures that are usually of predefined sizes and shapes.
This process to build Pre Engineered buildings or Steel structural Buildings requires skills and experience, who can take raw components and transform them into marketable products. When you are constructing a replacement residential or commercial building, your most vital goal is to form sure you’ve got a rigid foundation for your building.
Availability: | |
---|---|
Quantity: | |
High-Strength | Customizable | Fast Global Delivery
Component | Standard Configuration | Premium Upgrade Options |
---|---|---|
Main Frame | Welded H-section (Q345B) | ASTM A992 Gr.50 |
Purlins | Cold-formed C/Z sections | Sigma sections for heavy load |
Roof Panel | 0.5mm PPGI | Standing seam roof system |
Insulation | 50mm glass wool (R-value 3.2) | PIR sandwich panel (R-value 6) |
Warranty | 25-year anti-corrosion | 30-year performance guarantee |
Stage Control Points Certification
Raw Material Mill test certificates EN 10204 3.1
Fabrication Dimensional tolerance ±2mm ISO 9013
Surface Prep Sa 2.5 blast cleaning SSPC/NACE
Coating 3-layer epoxy system ASTM D4541
Packaging Weather-proof crating ISTA 3E
✅ International Certifications (ISO, CE, ASTM)
✅ 15-30 Days Faster Delivery than industry average
✅ 30% Cost Saving vs traditional construction
✅ 10,000+ Projects completed worldwide since 1997
High-Strength | Customizable | Fast Global Delivery
Component | Standard Configuration | Premium Upgrade Options |
---|---|---|
Main Frame | Welded H-section (Q345B) | ASTM A992 Gr.50 |
Purlins | Cold-formed C/Z sections | Sigma sections for heavy load |
Roof Panel | 0.5mm PPGI | Standing seam roof system |
Insulation | 50mm glass wool (R-value 3.2) | PIR sandwich panel (R-value 6) |
Warranty | 25-year anti-corrosion | 30-year performance guarantee |
Stage Control Points Certification
Raw Material Mill test certificates EN 10204 3.1
Fabrication Dimensional tolerance ±2mm ISO 9013
Surface Prep Sa 2.5 blast cleaning SSPC/NACE
Coating 3-layer epoxy system ASTM D4541
Packaging Weather-proof crating ISTA 3E
✅ International Certifications (ISO, CE, ASTM)
✅ 15-30 Days Faster Delivery than industry average
✅ 30% Cost Saving vs traditional construction
✅ 10,000+ Projects completed worldwide since 1997