Steel structure engineering is a structure mainly made of steel, mainly composed of steel beams, steel columns, steel truss and other components made of section steel and steel plates. The components or parts are usually connected by welds, bolts or rivets. One of the main building structure types. Because of its light weight and simple construction, it is widely used in large-scale factories, bridges, stadiums, super high-rises and other fields.
Availability: | |
---|---|
Quantity: | |
High-Strength | Customizable | Fast Global Delivery
Component | Standard Configuration | Premium Upgrade Options |
---|---|---|
Main Frame | Welded H-section (Q345B) | ASTM A992 Gr.50 |
Purlins | Cold-formed C/Z sections | Sigma sections for heavy load |
Roof Panel | 0.5mm PPGI | Standing seam roof system |
Insulation | 50mm glass wool (R-value 3.2) | PIR sandwich panel (R-value 6) |
Warranty | 25-year anti-corrosion | 30-year performance guarantee |
Stage Control Points Certification
Raw Material Mill test certificates EN 10204 3.1
Fabrication Dimensional tolerance ±2mm ISO 9013
Surface Prep Sa 2.5 blast cleaning SSPC/NACE
Coating 3-layer epoxy system ASTM D4541
Packaging Weather-proof crating ISTA 3E
✅ International Certifications (ISO, CE, ASTM)
✅ 15-30 Days Faster Delivery than industry average
✅ 30% Cost Saving vs traditional construction
✅ 10,000+ Projects completed worldwide since 1997
High-Strength | Customizable | Fast Global Delivery
Component | Standard Configuration | Premium Upgrade Options |
---|---|---|
Main Frame | Welded H-section (Q345B) | ASTM A992 Gr.50 |
Purlins | Cold-formed C/Z sections | Sigma sections for heavy load |
Roof Panel | 0.5mm PPGI | Standing seam roof system |
Insulation | 50mm glass wool (R-value 3.2) | PIR sandwich panel (R-value 6) |
Warranty | 25-year anti-corrosion | 30-year performance guarantee |
Stage Control Points Certification
Raw Material Mill test certificates EN 10204 3.1
Fabrication Dimensional tolerance ±2mm ISO 9013
Surface Prep Sa 2.5 blast cleaning SSPC/NACE
Coating 3-layer epoxy system ASTM D4541
Packaging Weather-proof crating ISTA 3E
✅ International Certifications (ISO, CE, ASTM)
✅ 15-30 Days Faster Delivery than industry average
✅ 30% Cost Saving vs traditional construction
✅ 10,000+ Projects completed worldwide since 1997