1. Production introduction of Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction
Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction have many advantages, which include quality and speed, safety, strength, light weight, free design, ecnomic efficiency and etc.
Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction is widly used on steel warehouse, workshop, hangar, shed and other industrial steel buidlings.
2. Specification of Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction
ITEMS | SPECIFICATION | |
Main Steel Frame | Colum | Q235,Q345 Welded H Section Steel |
Beam | Q235,Q345 Welded H Section Steel | |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance System | Roof System | Roof Panel (EPS/Fiber Glass Wool/Rock Wool/PU Sandwich Panel or Steel Sheet Cover) and Accessories |
Wall System | Wall Panel (Sandwich Panel or Corrugated Steel Sheet | |
Window System | Aluminum Alloy Window/ PVC Window/Skylight | |
Door System | Sliding Sandwich Panel Door/Rolling Metal Door/PVC Door | |
Others | PVC Rain spout,Gutter etc | |
Wind Resistance Grace | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure life span | Up to 50 years | |
Temperature | Suitable temperature -50℃~+50℃ | |
Certification | CE, SGS, ISO9001:2015, ISO 14001:2015 | |
Finishing Options | Vast array of colors and textures available | |
Paint Options | Alkyd painting, primary painting, two finish painting(gray paint, red paint, white paint, epoxy zinc etc.) or Galvanized. |
3. Product details of Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction
4. Production equipments for Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction
5. Delivery, shipping and service for Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction
Delivery in 30 to 45 days after drawing confirmation.
6. Oversea cooperation for Prefabricated Ghana Steel Metal Manufacturing Fabrication And Construction