1. Products Description:
A Pre-engineered Fireproof Automatic Aircraft Steel Hangar Building Structure is designed by a manufacturer to be fabricated using a pre-determined inventory of raw materials and manufacturing methods. Steel hangar is a closed structure to hold aircraft, spacecraft or cars in protective storage. Steel hangars are used for protection from weather, protection from direct sunlight, maintenance, repair. Hangars need special structures to be built, it is cost savings and fast build.
2. Products Specification for Fireproof Automatic Aircraft Steel Hangar Building Structure:
Main Steel Structure | H section, Galvanized C purlin |
Roof | UPVC roof with glasswool insulation |
Wall | Cement sandwich panel with real stone painting |
Window | Aluminum power coated window |
Door | Wooden or steel entrance door |
Stairs and rail | Steel stairs and power coated rail |
Gutter | Galvanized or color aluminum |
Facility | Toilet, shower room, washbasin cabinet and etc |
3. Advantages of Fireproof Automatic Aircraft Steel Hangar Building Structure:
1. High material strength
2. Light house weight
3. Safe and reliable
4. High degree of industrial production
5. Beautiful and reusable
6. Good seismic performance
7. Lesser construction time / greater erection speed
4. Products Show:
5. Materials:
6. Our service:
1. 24 hours online & one to one service, solve your problem efficiently.
2. Professional installation team and site engineers for foreign countries.
3. More than 25 years' experiences, our products had been exported to more than 80 countries all over the world.
4. We supply R & D, engineering, fabrication, exporting, and installation with one stop shopping service.
5. With ISO9001:2015, SGS, BV and CE certification
6. Xinguangzheng group with 5 branch factories located in Qingdao, Shandong Province. Our annual production capacity: only for H welded steel: 720,000 TONS – 1,200,000 TONS per year
7. Design software: PKPM, 3D3S, X-Steel, SAP2000, AUTOCAD, T-Arch, etc.
7. FAQ:
1. Are your manufacturer or trading company?
We are manufacturer, we are group company with 5 factories & over 23 years experiences.
2. How to buy your ideal products?
A: T/T and L/C are acceptable and T/T will be more appreciated. 30% deposit before producing, 70% balance before loading by T/T.
3. What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 30 to 40 working days.
4. How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as required, but the fees will be paid by customers.
5. How to install after the goods arriving destination?
A: We will provide detailed shop drawings to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.