Availability: | |
---|---|
Quantity: | |
1. Production introduction of Prefabricated Steel Structure School Stadium Space Frame Building
Steel framework (Q235B,Q345B) | 1.square tube |
wall and roof | 1.sandwich panel with EP,PU,glass wool and rock wool(50-100mm) |
Door | 1.roller door |
Window | 1.sliding window |
downpipe | 1.pvc |
2. Product feature and application forPrefabricated Steel Structure School Stadium Space Frame Building
a.Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS
c. Cost considering: Time saved, cost saved;
d. Easy installation, materials can be recycled used, environmentally;
c. Used widely: Workshop,warehouse,etc
d. Structural durability, easy maintenance.
3. Product details of Steel Space Structure Stadium
4. Product Qualifications of Prefabricated Steel Structure School Stadium Space Frame Building
5. Production line for Prefabricated Steel Structure School Stadium Space Frame Building
6.Packing and delivery for Prefabricated Steel Structure School Stadium Space Frame Building
Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.
7.Our customer
We keep in good connection with the oversea merchants, and have exported our products to over 120 countries, such as Canada, Australia, Germany, Brazil, England, the USA, Singapore, Thailand, Uruguay, Venezuela and Japan. Our Services and Product Quality are praised by most of our clients.
8.FAQ
Q: Are you a factory or trading company?
A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop service for our customer. And you can get the best price and competitive price.
Q: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q: Do you offer designing service for us?
A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.
Q: what is the terms of payment?
A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)
Q: What is the delivery time?
A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.
Q: How long can the space frame be used?
A: The use life of the main structure is the designed used life, that is 50-100 years (standard request of GB).
9. Basic design requirements of Prefabricated Steel Structure School Stadium Space Frame Building
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |
1. Production introduction of Prefabricated Steel Structure School Stadium Space Frame Building
Steel framework (Q235B,Q345B) | 1.square tube |
wall and roof | 1.sandwich panel with EP,PU,glass wool and rock wool(50-100mm) |
Door | 1.roller door |
Window | 1.sliding window |
downpipe | 1.pvc |
2. Product feature and application forPrefabricated Steel Structure School Stadium Space Frame Building
a.Light weight, high strength, 50years durable use, no construction waste.
b.Quality certification ISO, CE, BV and SGS
c. Cost considering: Time saved, cost saved;
d. Easy installation, materials can be recycled used, environmentally;
c. Used widely: Workshop,warehouse,etc
d. Structural durability, easy maintenance.
3. Product details of Steel Space Structure Stadium
4. Product Qualifications of Prefabricated Steel Structure School Stadium Space Frame Building
5. Production line for Prefabricated Steel Structure School Stadium Space Frame Building
6.Packing and delivery for Prefabricated Steel Structure School Stadium Space Frame Building
Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30~45 days after receiving the deposit.
7.Our customer
We keep in good connection with the oversea merchants, and have exported our products to over 120 countries, such as Canada, Australia, Germany, Brazil, England, the USA, Singapore, Thailand, Uruguay, Venezuela and Japan. Our Services and Product Quality are praised by most of our clients.
8.FAQ
Q: Are you a factory or trading company?
A: We are a factory and belongs to Qingdao Xinguangzheng Group. We can provide one-stop service for our customer. And you can get the best price and competitive price.
Q: Do you accept container loading inspection?
A: You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
Q: Do you offer designing service for us?
A: Yes, we could design full solution drawings as your requirements. They use software such as Auto CAD, PKPM, MTS, 3D3S, etc.
Q: what is the terms of payment?
A: Payment: L/C or by T/T(30% prepaid as deposit, the balance 70% before shipment)
Q: What is the delivery time?
A: Delivery time depends on order quantities. In general, the delivery time to the nearest seaport in China will be 30 days after receiving the deposit.
Q: How long can the space frame be used?
A: The use life of the main structure is the designed used life, that is 50-100 years (standard request of GB).
9. Basic design requirements of Prefabricated Steel Structure School Stadium Space Frame Building
Basic Design Requirements | ||
1.Project location | 5.Length (side wall,m) | 9.Window quantity, size |
2.Snow load | 6.Width (end wall, m) | 10.Door quantity, size |
3.Wind load | 7.Wall Height (eave, m) | 11.Brickwall needed or not. If yes, 1.2m high or 1.5m high |
4.Seismic magnitude | 8.Middle column allowed or not | 12.Crane needed or not |
13.Thermal insulation. If yes, EPS, fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former. |