Warehouse Building mainly refers to the main load-bearing components are composed of steel. Including steel columns, steel beams, steel structure foundation, steel roof truss (of course, the span of the plant is relatively large, and it is basically steel structure roof truss now), steel roof, pay attention to the wall of steel structure can also use brick wall maintenance.
Availability: | |
---|---|
Quantity: | |
High-Strength Seismic Steel Beam column
Lightweight 丨Earthquake-Resistant 丨Cost-Effective
✅ 30% Higher Load Capacity
Tensile Strength: 470-630 MPa (Tested by SGS)
✅ Seismic Safety Guaranteed
Passed Magnitude 9 Simulation Test
✅ Faster Installation
Pre-drilled Bolt Holes for Quick Assembly
Parameter | Specification | Int'l Standard |
Structure | Steel welded H section | ISO9001:2015, SGS, BV and CE certification |
Purlin | C section channel or z section | |
Connecting | High strength bolts | |
Section Size | Customized | |
Coating | Hot-dip Galvanized | |
Packing | Pallet to load the cargo, more convenient |
Sea Freight: FOB Qingdao
Delivery Process:
Confirm Drawing
Production (30-45 Days)
Real-time Shipment Tracking
Mode Of Despatch
Modular Shipping:Housing modules are transported disassembled for quick on-site assembly.
International Shipping:Container shipping services ensure modules arrive intact.
Delivery Time: 15-20 days for standard modules, 30-45 days for customized modules.
? FAQ
Q: Are your manufacturer or trading company?
A: We are manufacturer, we are group company with 5 factories & over 23 years experiences.
Q:Can the product be customized in size?
A:Yes, we support customization of length, section size, etc., according to customer requirements.
Q:How is the insulation performance of modular housing?
A:High-performance composite insulation panels provide better insulation than traditional building materials.
High-Strength Seismic Steel Beam column
Lightweight 丨Earthquake-Resistant 丨Cost-Effective
✅ 30% Higher Load Capacity
Tensile Strength: 470-630 MPa (Tested by SGS)
✅ Seismic Safety Guaranteed
Passed Magnitude 9 Simulation Test
✅ Faster Installation
Pre-drilled Bolt Holes for Quick Assembly
Parameter | Specification | Int'l Standard |
Structure | Steel welded H section | ISO9001:2015, SGS, BV and CE certification |
Purlin | C section channel or z section | |
Connecting | High strength bolts | |
Section Size | Customized | |
Coating | Hot-dip Galvanized | |
Packing | Pallet to load the cargo, more convenient |
Sea Freight: FOB Qingdao
Delivery Process:
Confirm Drawing
Production (30-45 Days)
Real-time Shipment Tracking
Mode Of Despatch
Modular Shipping:Housing modules are transported disassembled for quick on-site assembly.
International Shipping:Container shipping services ensure modules arrive intact.
Delivery Time: 15-20 days for standard modules, 30-45 days for customized modules.
? FAQ
Q: Are your manufacturer or trading company?
A: We are manufacturer, we are group company with 5 factories & over 23 years experiences.
Q:Can the product be customized in size?
A:Yes, we support customization of length, section size, etc., according to customer requirements.
Q:How is the insulation performance of modular housing?
A:High-performance composite insulation panels provide better insulation than traditional building materials.